Object: Site Supervision and Safety Coordination during the Execution Phase for the construction of the Ennio Flaiano Bridge in Pescara.
Team: Engeko, SIS.
Work Amount: € 13.100.000,00
The new cable-stayed bridge over the Pescara River is of the cable-stayed type, with a single pylon located in the center of the North roundabout, on the bank of the Pescara River. The bridge consists of a deck with two spans, measuring 85.90 m and 9.00 m respectively, for a total length of 94.90 m. The total width of the deck is approximately 28.00 m, divided into two half-decks of 12.35 m each with a central space of 3.30 m.