Object: Site Supervision and Safety Coordination for the completion of the Perugia-Ancona route through the construction of the “Pianello-Valfabbrica” section of the SS318 Valfabbrica, the “Fossato Vico-Cancelli” and “Albacina-Serra Quirico” sections of the SS76 Val d’Esino, and the construction of the “Pedemontana della Marche”.
Team: Engeko, Face.
Work Amount: € 808.328.016,99
The highway project refers to the General Contracting works for the modernization and enhancement of the Perugia-Ancona route and the Pedemontana delle Marche, for a total length of 67.1 km. Overall have been built: 55 bridges and viaducts (totaling 7.6 km), the excavation of 24 new tunnels (totaling 19.7 km), the adaptation of 11 existing tunnels (totaling 5.8 km) and 16 interchanges.